Xian Sulab Machinery Co., Ltd. 86--15109261813 sulaberic@parts-elevator.com
OT*S GECB Main Board DBA26800EE13 Elevator Control PCB with Signal Processing and Safety Monitoring

OT*S GECB Main Board DBA26800EE13 Elevator Control PCB with Signal Processing and Safety Monitoring

  • Mettre en évidence

    Signal Processing GECB Main Board

    ,

    Safety Monitoring Elevator Control PCB

    ,

    DBA26800EE13 Model Lift Control Board

  • Marque
    SULAB
  • Description
    Pièces d'ascenseur
  • Modèle
    DBA26800EE13
  • MOQ
    1 pièce
  • Transport
    TNT, UPS, DHL, Fedex, Air, Mer
  • En vigueur
    Ascenseur
  • Forfaits
    Carton, caisse en bois, palette, etc.
  • Délai de livraison
    Normalement 2-3 jours ouvrables après le paiement
  • Garantie
    Un an
  • Mode de paiement
    Banque d'entreprise, Western Union, Paypal, etc.
  • Nom de marque
    SULAB
  • Numéro de modèle
    DBA26800EE13
  • Quantité de commande min
    1 pièce
  • Délai de livraison
    Normalement 2-3 jours ouvrables après le paiement
  • Conditions de paiement
    LC, D/A, D/P, T/T, Western Union

OT*S GECB Main Board DBA26800EE13 Elevator Control PCB with Signal Processing and Safety Monitoring

OT*S GECB Main Board DBA26800EE13 | GEN2 MRL Elevator General Control PCB Board Signal Processing & Safety Monitoring Lift Spare Parts


DBA26800EE13 is the original GECB (General Elevator Control Board) core main control PCB exclusively matched for OTIS GEN2 machine-room-less elevators. As the central brain of the whole elevator system, it adopts industrial-grade microprocessor control architecture, integrates multi-channel signal input/output terminals, CAN bus communication ports and fault diagnosis circuits. It perfectly supports steel belt traction system, encoder position feedback, leveling sensor signal reception and all safety loop detection functions.


Brand SULAB
Description Elevator  parts
Model DBA26800EE13
MOQ 1PC
Transportion TNT, UPS, DHL, Fedex, Air, Sea
Applicable Elevator
Packages Carton, Wooden case, Pallet etc
Delivery Time Normally 2-3 working days after payment
Warranty One year
Payment Method Company Bank, Western union, Paypal etc


  • Overall Elevator Operation Logic Control

    Process all call signals from COP, LOP and car top; calculate running speed, acceleration, deceleration and leveling points to realize smooth start, uniform speed operation and accurate floor stop of GEN2 elevator.
  • Multi-Sensor Signal Collection & Analysis

    Receive feedback signals from traction motor encoder, steel belt monitoring sensor, leveling photoelectric sensor and safety circuit switches; judge real-time car position, belt health and door lock state continuously.
  • Safety Loop Interlock Protection

    Monitor safety chain including over-speed switch, car door lock, landing door lock, pit safety switch and terminal limit. Cut off traction drive output immediately once abnormal signal detected to prevent 冲顶,squat and running with open doors.
  • System Communication & Data Interaction

    Realize two-way data transmission between main board, door operator board, belt monitoring device and inverter via CAN bus; support remote fault upload and elevator traffic scheduling optimization.
  • Fault Recording & Predictive Maintenance

    Automatically store historical fault codes, running records and abnormal signal logs. Help maintenance staff quickly locate failure causes, shorten elevator downtime and reduce maintenance costs.